Improvements to the South Churchyard, which is currently a dark, damp, overgrown space, on multiple levels including a set of steep steps that take one up to a gate that is no longer viable. We will renovate, repair and render the existing walls to the churchyard, the cloister and the current Sacristy, to allow for architectural excavation and to build a new Sacristy and office/store within existing South Sacristy footprint, raising the floor level to allow seamless connection to South Aisle.
Budget £727,000
Interior, showing water dripping down to icons.
Exterior, showing south side gardens to be levelled and renovated.
Interior, showing water egress.
Exterior of site where new office will be located.
Proposed Plans.